Nonlinear Output Constraints Handling for Production Optimization of Oil Reservoirs EAGE

Nonlinear Output Constraints Handling for Production Optimization of Oil Reservoirs EAGE

This page is a publication and represents journal papers, conference papers and proceedings etc.

0
No votes yet

users have rated this content. We would love to have your vote as well. Log in and rate!



Abstract

The paper proposed the use of Lagrangian-barrier method to handle nonlinear output constraints problem
Content

The paper proposed the use of Lagrangian-barrier method to handle nonlinear output constraints problem

Other key information

207 results
Below, you will find related content (content tagged with same topic(s) as this publication)
Content type: Presentation page for handbook

Integrated Planning in Oil & Gas Industry

Designing and Cultivating IPL Practices

5
Content type: Publication

Integrated production optimization of oil fields with pressure and routing constraints: The Urucu field

This is scientific publications written in collaboration with the IO Center

5
Content type: Publication

Integrated Reservoir Modelling of the Norne Field

Volume Visualization/Seismic Attribute,Structural and Property Modeling

0
Content type: Publication

Integrating Networked Process Systems to Solve Dynamic Optimization Problems

This is a scientific publication written in collaboration with the IO Center.

0
Content type: Publication

Integration by Infrastructuring: The Case of Subsea Environmental Monitoring in Oil and Gas Offshore Operations

Development of ICT solutions for performing real-time subsea environmental monitoring during oil and gas offshore operations

0
Content type: Presentation page for handbook

Interdisciplinary decision making in production optimization

Handbook in interdisciplinary decision making in production optimization.

0
Content type: Topic page

Interdisciplinary Risk Assessment in Integrated Operations

Addressing Human and Organisational Factors in Major Accident Loss Prevention

0
Content type: Project

IO 1 - IO Teamwork and Capabilities (Phase 2)

Distributed collaboration, IO leadership and capability development

0
Content type: Project

IO 3 - Proactive Management of Safety and Environment (Phase 2)

Applying IO-related solutions to prevent major accidents

0
Content type: Project

IO 4 - Production Optimization and Subsurface IO (Phase 2)

Production Optimization and Subsurface IO is a project with focus on using models and predictions to enhance utilization of oil fields.

0

Pages