Discrete Optimization of Oil Production in Thin Oil Rim Reservoir Under Geological Uncertainty

Discrete Optimization of Oil Production in Thin Oil Rim Reservoir Under Geological Uncertainty

This page is a publication and represents journal papers, conference papers and proceedings etc.

0
No votes yet

users have rated this content. We would love to have your vote as well. Log in and rate!



Abstract

A control system that distributes fluids from an injection to a production well at an adjustable rate has attracted considerable interest in recent years. Several optimization algorithms have been developed for this system and these techniques have proved to be beneficial in reservoir development. In this study, we propose a discrete optimization approach to increase oil production from thin oil rim reservoirs by smart horizontal wells under waterflooding. The smart well was equipped with several on-off control valves that can be adjusted to reach optimum oil production by maximize sweep efficiency and delay water breakthrough. This bring into optimization problem that involves discrete possible choices with valves settings as decision variables. We perform Binary Integer Programming (BIP) in order to decide valves settings in the injection and production well. BIP is one of linear programming problem where variable required being 0 or 1. These variables correspond with on-off control valves. Preliminary results obtained with this methodology show a significant improvement in the oil recovery factor, and the water saturation at breakthrough is observed to be more uniformly distributed across the reservoir, when compared with the reference non-optimized case.
Content

A control system that distributes fluids from an injection to a production well at an adjustable rate has attracted considerable interest in recent years. Several optimization algorithms have been developed for this system and these techniques have proved to be beneficial in reservoir development. In this study, we propose a discrete optimization approach to increase oil production from thin oil rim reservoirs by smart horizontal wells under waterflooding. The smart well was equipped with several on-off control valves that can be adjusted to reach optimum oil production by maximize sweep efficiency and delay water breakthrough. This bring into optimization problem that involves discrete possible choices with valves settings as decision variables. We perform Binary Integer Programming (BIP) in order to decide valves settings in the injection and production well. BIP is one of linear programming problem where variable required being 0 or 1. These variables correspond with on-off control valves. Preliminary results obtained with this methodology show a significant improvement in the oil recovery factor, and the water saturation at breakthrough is observed to be more uniformly distributed across the reservoir, when compared with the reference non-optimized case. In the second stage of this study we add uncertainty in the geological description of the reservoir (permeability distribution), and perform robust optimization. To this end, we consider statistics of the Net Present Value (NPV) in the optimization objective function. We maximize an average of the NPV, and we control the risk attitude by means of a penalty term that involves the standard deviation of that quantity.

Other key information

206 results
Below, you will find related content (content tagged with same topic(s) as this publication)
Content type: Publication

Correspondence between the low- and high-frequency limits for anisotropic parameters in a layered medium

This is a scientific publication written in collaboration with the IO Center.

0
Content type: Presentation

Course : Long term production optimization

Listing of contents of an existing course material related to "Long term reservoir optimization".

0
Content type: Topic page

Daily production optimization

Determine the optimal production strategy in day to day operations.

5
Content type: Presentation page for handbook
Content type: Business case

Daily production optimization at Petrobras Marlim

IO4 is working together with Petrobras to automatically find the best production strategy for their Marlim P-35 FPSO.

4.5
Content type: Publication

Daily Production Optimization for Subsea Production Systems

Methods based on mathematical programming and surrogate modelling

0
Content type: Publication

Decision Support in Long Term Planning of Petroleum Production Fields

This is a scientific publication written in collaboration with the IO Center.

4
Content type: Publication

Direct Dix-type inversion in a layered VTI medium

This is a scientific publication written in collaboration with the IO Center.

0
Content type: Publication

Discrete Optimization of Oil Production in Thin Oil Rim Reservoir Under Geological Uncertainty

This is a scientific publication written in collaboration with the IO Center.

0
Content type: Publication

Distributed Optimization and Control of Offshore Oil Production: The Intelligent Platform

This is a scientific publication written in collaboration with the IO Center.

0

Pages