Robust Work Practices in the Petroleum Industry

Robust Work Practices in the Petroleum Industry

This page is a handbook – a practical guideline for implementation of a method or a broader field of IO.

0
No votes yet

users have rated this content. We would love to have your vote as well. Log in and rate!



This handbook is useful for anyone with an interest or stake in the topic of safety in the petroleum industry in general, and in integrated operations (IO) in particular. This may, for example, be team leaders and team members who to a large extent rely on multidisciplinary collaboration across geographical distances, IO specialists, human factors specialists, people who work with the design of work processes, HSE engineers and HSE teams, and probably many more. Unfortunately, there are no ready-made solutions for many of the challenges of practice and safety in IO. Many of the themes that this handbook addresses are associated with dilemmas whose solutions are neither generic nor given, but must be negotiated in the specific domain (e.g. drilling, production, maintenance) and context where they appear. We have arranged the themes into three main areas that correspond to different levels in the organisation, from the sharper – hands on – to the blunter – organisational – ends. Level 1: How to behave and collaborate in multi-disciplinary teams in an IO setting. Level 2: How to work with procedures and responsibilities under varying conditions. Level 3: How to configure an organisation for IO
Content

Other key information

194 results
Below, you will find related content (content tagged with same topic(s) as this presentation page for handbook)
Content type: Report

The Integrated Operations Maintenance and Modification Planner (IO-MAP) The first usability evaluation – study and first findings

The Integrated Operations Maintenance and Modification Planner (IO-MAP) is a software test bed, which is being designed in an iterative process.

5
Content type: Publication

A capability approach to integrated operations

This white paper tries to summarise the first initial thinking on capability development and capability platforms.

4
Content type: Report

A Method for Function Analysis and Allocation in IO-driven MTO Systems: Challenges and Prospects

Describes use of the IO MTO method in functional analysis and allocation

0
Content type: Report

A new telemedicine practice on-the-go

Development and demonstrations of a telemedicine prototype that enables the key features of the “Virtual Examination Room - On the go”.

0
Content type: Publication

A structured approach to improved condition monitoring

A paper describing a systematic approach to select and implement appropriate condition monitoring for systems, structures and components.

0
Content type: Presentation

Acceptance criteria for dynamic risk analysis

Presentations at IO Center Work Shop Sept 2013

0
Content type: Presentation

Addressing Dynamic Risk in the Petroleum Industry by Means of Innovative Analysis Solutions

Presentation given at the CISAP-6 conference in Bologna (13-16 April 2014)

0
Content type: Report

Anomaly detection and sensemaking in time series interpretation

Interim report on the development of anomaly detection methods in conjunction with risk indicators and decision support

0
Content type: Report

Assessment of the Petrobras Telemedicine Project in Santos Basin: The Future of Telemedicine in O&G, Work package 1: Capabilities and Resilience

Assessment of the Petrobras Telemedicine Project in Santos Basin: The Future of Telemedicine in O&G, Work package 1: Capabilities and Resilience

0

Pages