Aker Solutions

Aker Solutions

This partner does not currently have an updated profile.
17 results
Involved in:
Content type: Topic page

Condition monitoring

A process for capturing anad analysing data and information in order to understand the true condition of equipment and systems.

0
Content type: Publication

Cross Cultural Collaboration

Masteroppgave - Ledelse av teknologi

0
Content type: Ongoing activity

Final report available

After 8 years as a Center for research-based innovation (CRI/SFI) the IO Center has made a final report of the period.

0
Content type: Topic page

Integrated Planning and Logistics

This topic is about Integrated Planning and Logistics (IPL) where transferring of the IO principles to the planning domain has led to the IPL

5
Content type: Presentation page for handbook

Integrated Planning in Oil & Gas Industry

Designing and Cultivating IPL Practices

5
Content type: Project

IO 2 - Integrated Planning and Logistics (Phase 2)

This is the page for R&D projects in the IO Center

0
Content type: Project

IO 4 - Production Optimization and Subsurface IO (Phase 2)

Production Optimization and Subsurface IO is a project with focus on using models and predictions to enhance utilization of oil fields.

0
Content type: Video

IO Center

A short video introducing the IO Center

0
Content type: Ongoing activity

IO Center annual report for 2013 is now published

The annual report covering the activities in 2013 is now available.

0
Content type: Presentation page for handbook

Planejamento Integrado no Setor de Óleo e Gás

Projeto e Desenvolvimento de Práticas de IPL (Integração do Planejamento e Logística)

0
Content type: Project

Program 2 Reservoir Management and Production Optimization (Phase 1)

Production Optimization and Subsurface IO is a project with focus on using models and predictions to enhance utilization of oil fields.

0
Content type: Project

Program 3 Operation and maintenance (Phase 1)

Program 3 was dedicated to exploring new ways of gathering and handling data for the purpose of supporting operation and maintenance activities.

0
Content type: Topic page

System integrity and dynamic risk assessment

Avoid unplanned shutdowns, reduce maintenance downtime and increase production availability.

0
Content type: Project

T3 - System Integrity and Dynamic Risk Assessment

In this project we work towards defining what information is needed to put operational maintenance decision in a risk perspective.

0
Content type: Publication

Task leader/planner collaboration in Aker Solutions

What characterizes the practice between task leader and planner with regard to collaboration?

0
Content type: Presentation

The IPL Learning Lab report 2nd-3rd Oct 2014

Report on main results and concluding remarks

5
Content type: Publication

The Planner in Practice

A case study of the Planner in Aker Solutions’ M&M contract

0
Center for research-based innovation, NTNU, Sintef, IFE