The future of Telemedicine in O&G (phase 1)

The future of Telemedicine in O&G (phase 1)

This page is a business case describing a case study or a pilot project involving one or several industry partners

5
Average: 5 (2 votes)

2 users have rated this content. We would love to have your vote as well. Log in and rate!



The scope of phase 1 was to achieve a telemedicine decision support system and workflow regarding the Vscan handheld ultrasound. Key results from phase 1: • All participants were able to acquire cardiac ultrasound images of such a quality that experts were able to get important information of cardiac function and pathology. • This will improve diagnostics, medical safety and health quality on offshore installations. • This development ensures trust in the overall HSE service offshore. • With optimal workflow it should not take more than 5-7 minutes to have a decision from the medical expert. • This development of optimal workflow will move today’s telemedicine to a significantly higher level of “telemedicine of tomorrow”. The scope of phase 2 – see IO center project - is a decision support system for faster and better medical decisions by an optimal workflow and collaboration, between medics onshore and offshore. The medical experts want to access the key medical data “on the go” and operate a video link “on the go”. If they have the right medical data they can make good quality decisions within 2-5 minutes. The purpose is to make better and faster medical decisions based on high quality medical information.
Content

Other key information

205 results
Below, you will find related content (content tagged with same topic(s) as this business case)
Content type: Report

Communicating Risk in Planning Activities Distributed in Time

This report describes a standardised maintenance and operations planning process for offshore installations.

0
Content type: Publication

Conditions for Resilient Operations of Complex Systems Undergoing Technological Alterations

Emergence of risk in IO and resilience perspective for emergency handling

0
Content type: Publication

Construction of risk images in the oil and gas production industry

Three categories of risk images: 1) traditional risk images, 2) technological optimism and 3) reconfigured risk images.

0
Content type: Publication

CRIOP: A Human Factors Verification and Validation Methodology That Works in an Industrial Setting

Methodology to verify and validate safe and efficient operations in control centers

0
Content type: Publication

Cross Cultural Collaboration

Masteroppgave - Ledelse av teknologi

0
Content type: Topic page

Daily production optimization

Determine the optimal production strategy in day to day operations.

5
Content type: Presentation page for handbook
Content type: Publication

Daily Production Optimization for Subsea Production Systems

Methods based on mathematical programming and surrogate modelling

0
Content type: Presentation

Decision Support Framework for Well Location at Martin Linge Oil Field (IO13 poster)

Optimization of Well Placement Using Derivative-Free Methods

0
Content type: Report

Decision Support Tool for Dynamic Barrier Management for Erosion Integrity

Applicability of barrier management methods to support critical decisions to help prevent and mitigate the occurrence of major accidents.

0

Pages